A showcase of our work across Kenya. Boreholes, solar systems, water pumps, and civil works — all delivered to spec.

124 m borehole drilled for institutional domestic use. 24-hour controlled rate pump test confirmed 5 m³/hr yield. Water quality certified by Cropnuts ISO/IEC 17025 accredited laboratory.

Solar-powered community borehole serving domestic and agricultural use. 36-panel 7.5 kW hybrid solar system with genset backup. Motor assessment, replacement, and full commissioning.

Two-phase solar pump installation and 7.8 km transmission pipeline for Northern Rangelands Trust communities. 21 × 620 W solar panels, hybrid control panels, DIN 5-36 surface pump.

24-hour controlled rate pump test at 5.2 m³/hr yield. Grundfos SP 5A-44 pump set at 96 m depth. Full drawdown and recovery analysis. Water quality tested at Quantam Industrial Laboratories.

Full borehole rehabilitation including pump lifting, camera inspection, silt removal via air jetting, and complete motor and pump replacement. Solar upgrade recommended at handover.

Motor replacement (Pedrollo 1.1 kW), 9-1 Spectra desalination plant servicing, and assessment of Lon Topi new well. Solar structure and shallow well confirmed operational.

Interior cleaning of 90-room commercial hotel PPR piping system (20 mm to 63 mm). Chemical disinfection and high-pressure flush across all guest rooms, public toilets, and kitchen. Supervised by Davis and Shirtliff consultant.

Fabrication and installation of a solar support structure for 6 panels powering a 6000VA hybrid inverter with a 5.12kWh lithium battery. System tested and commissioned successfully.

Lifting of dead motor and broken pump, borehole flushing, supply and installation of a new 5.5kW submersible motor and pump. System commissioned and tested successfully.

Full solarisation and installation of a 3kW 3-phase submersible motor and pump end. System tested and functioning correctly.

Completion of foundation works supporting an 18m steel tank stand with a 48m³ capacity.

Full borehole servicing including lifting existing pump, camera inspection, air jetting and flushing, 24-hour test pumping, pump servicing, reinstallation and commissioning. System tested functioning correctly.

Replacement of pool pump, tested and commissioned successfully.